1st week: Technological processes used for the construction of the shell. Classification of the processes ? production of bearing structures, of the external cladding, roofs, completing the construction, scaffolding and casing. 2nd week: Monolithic concrete structures. Producing and transport of concrete mixtures. Storing and additives, special mixtures, curing, machines and equipment for working with concrete. 3rd week: Reinforcing concrete structures, production of steel bars, types of reinforcement, placement and fixation, curing the reinforcement. 4th week: Casing monolithic concrete, scaffolding. Designing the casing, types of casing, casing for large surface, special casing, sliding casing, permanent casing, creating the desired final surfaces. Scaffolding ? assembly and dismantling, types of scaffolding, anchoring, solicitations, work safety on scaffolding. 5th week: Masonry structures ? brick and stone. Types of masonry, procedure for building using various materials, stone structures, vaults, procedures for building and demolition, using precast materials in the structure. 6th week: Technology of timber structures. Production of timber structures, assembly, main principles for using timber in a construction, durability, protection. 7th week: Steel structures and precast structures. Production, transportation and storage, assembly methods and procedures, work safety, machines for heavy assembly, assembly equipment. 8th week: External cladding and roofs. Main types of cladding and roofs, technological procedures for their creation, materials and structures, assembly procedures, accessory structures and activities, procedures for the construction of flat and sloped roofs. 9th week: Technological processes for insulating. Main types of insulating in a construction, their parameters, main work principles, used materials, protecting, ensuring the functionality and durability. 10th week: Technical equipment of a building. Types of pipe systems and their sequence in a construction, materials and technologies, systems for water distribution for fire security, data networks. 11th week: Finishing works ? surfaces of walls and ceilings, installing doors and windows, installing carpentry products, glazing, special elements and structures. 12th week: Installing floors in buildings, arrangements outside the building, types of floors considering the use of the construction, technology of installing and curing, paving, adjusting the socles and the external cladding. 13th week: Final completing activities. Painting, decorating, equipment of bathrooms and kitchens, dismantling the site equipment, modifications of the terrain and of the green areas, preparation for approval, handing over.
|
-
Jarský a kol. Technologie staveb II. CERM Brno.
-
Jarský Čeněk a kol. Technologie staveb I. Příprava a realizace staveb. CERM,2019, Brno, 2019. ISBN 978-80-7204-994-3.
-
Kočí a kol. Technologie pozemních staveb I. VUT Brno.
-
Musil F. a kol. Technologie staveb, Dokončovací práce 2. Bratislava,Slovenská techn.univerzita, 2003. ISBN 80-227-2084-4.
-
Zapletal I., Musil F. a kol. Technologie staveb, Dokončovací práce 1. Slovenská technická univerzita ,Bratislava, 2002.
|